EMUport CORE
en
Language
en
English
de
Deutsch
cs
Česky
fr
Français
el
Ελληνικά
hu
Magyar
ko
한국어
pl
Polski
ro
Română
tr
Türkçe
Home
General
About these instructions
Copyright
Subject to change
Exclusion from warranty and liability
Safety
Safety signs, instructions, and text markups
Staff qualifications
Protective equipment for staff
Electrical work
Monitoring devices
Pumping of fluids that are hazardous to health
Explosive atmosphere in the collection tank
Transport
Installing/dismantling
During operation
Cleaning and disinfection
Maintenance tasks
Operator responsibilities
Application/use
Intended use
Fluids
Improper use
Product description
Design
Materials
Safety device
Monitoring devices
Operating principle
Operation with frequency converter
Type key
Technical data
Date of production
Scope of delivery
Accessories
Transportation and storage
Delivery
Transport
Removing the transportation lock
Use of lifting equipment
Storage
Return delivery
Installation and electrical connection
Staff qualifications
Installation types
Operator responsibilities
Installation
Note on fixation material
Note on pipework
Work steps
Preparing the installation
Installing the lifting unit
Connecting the discharge pipe
Connecting the inlet
Connecting the ventilation pipe
Installing separately delivered sewage pumps
Electrical connection
Fuse on mains side
Mains connection
Switchgear
Connecting the sewage pumps
Connection of P 13 motor
Connection of FK 17.1 motor
Connection of FK 202 motor
Connection of FKT 20.2 motor
Connecting the level control device
Operation with frequency converter
Commissioning
Staff qualifications
Operator responsibilities
Operation
Tasks before commissioning
Initial commissioning
Operation
Application limits
During operation
Washing the collection tank with the flushing line
Emergency operation
Level control failure
Lifting unit failure
Flooding of the lifting unit (accident)
Shutdown/dismantling
Staff qualifications
Operator responsibilities
Shutdown
Removal
Cleaning and disinfection
Maintenance and repair
General overhaul
Staff qualification
Operator responsibilities
Basic tools
Operating fluid
Maintenance work
Checking connections for impermeability
Cleaning the inlet pipe, collection tank and overflow channel
Cleaning the solids separation tanks
Replacing the operating fluid of the sewage pump
Removing the sewage pump
Faults, causes and remedies
Spare parts
Disposal
Protective clothing
Operating fluids
Information on the collection of used electrical and electronic products
Appendix
Suggestions on the pump chamber