Connecting the sewage pumps

Before the connection, examine the insulation resistance of the motor windings and the monitoring equipment. CAUTION! If the values measured deviate from the specifications, there are two possible reasons: moisture entering the equipment or defects in the monitoring unit. Do not connect the pump and consult customer service.

Examining the insulation resistance of the motor winding

Examine the insulation resistance with an ohmmeter (measuring voltage = 1000 V). Examine these values:

Examining the temperature sensor of the motor winding

Examine the temperature sensor with an ohmmeter. Examine these values:

Examining the moisture sensor in the motor compartment

Examine the moisture sensor with an ohmmeter. Examine these values:

  1. The sewage pumps are installed.
  2. The insulation resistance of the motor windings and the monitoring equipment is checked.
  1. Connect the sewage pumps to the switchgear based on the wiring diagram. CAUTION! To dismantle the pumps from the lifting unit and set them down nearby at any time without disconnecting the connection cable from the switchgear, put the connection cables of the sewage pumps in a correct way.