Scope of delivery
- Solids separation system with two dry-installed submersible pumps
- 2x shut-off valves for the solids separation tanks
- 2x non-return valves at the discharge side
- 2x shut-off valves at the discharge side
- Consolidation of the discharge pipe
- 1x level probe
- 1x floor fixation as cross beam
- 2.5 m ventilation hose
- 1x maintenance kit with a blanking cover for the opening on the collection tank and a blanking cover for the discharge pipe
- Installation and operating instructions