Work steps
The pump chamber is installed in the following steps:
- Preparatory tasks.
- Dig a pit and install pump chamber.
- Connect the pressure pipe. See building installation “Connecting the pressure pipe”
- Connect the inlet. See building installation “Connect the inlet”
- Connect the vent. See building installation “Connecting the vent”
- Connect the cable pipe.
- Fit the pump chamber extension.
- Install the pump. See building installation “Install the pump”
- Install the level control device. See building installation “Install the level control device”
- Lay the connection cable.
- Backfill the pit.
- Fit the chamber cover. See building installation “Fit the chamber cover”