Connecting the vent
The connection of a venting line is a specified requirement. Observe the following points when connecting the venting line:
- Guide the venting line over the roof.
- All connections must be completely tight.
5 | Venting line connection |
- Pump chamber is installed properly.
- On-site venting line professionally installed.
- HT sleeve socket available
- Open the venting connection piece: Sawing edge approx. 25 mm.
- Deburr and smooth the sawing edge.
- Place the HT sleeve socket onto the venting connection piece.
- Insert the on-site venting pipe into the HT sleeve socket.
- Venting installed.
- Next step: Connect the emergency drain.