Connecting the vent

The connection of a venting line is a specified requirement. Observe the following points when connecting the venting line:

  • Guide the venting line over the roof.
  • All connections must be completely tight.
Labelling on the pump chamber
Labelling on the pump chamber

5

Venting line connection

  1. Pump chamber is installed properly.
  2. On-site venting line professionally installed.
  3. HT sleeve socket available
  1. Open the venting connection piece: Sawing edge approx. 25 mm.
  2. Deburr and smooth the sawing edge.
  3. Place the HT sleeve socket onto the venting connection piece.
  4. Insert the on-site venting pipe into the HT sleeve socket.
  1. Venting installed.
  2. Next step: Connect the emergency drain.
Venting connection
Venting connection