Install the pump

1

Pump

2

Discharge pipe

3

Slinging point

4

Cable tie

  1. On-site piping connected.
  1. Pump any existing water out of the pump chamber.
  2. Remove coarse contaminants in the pump chamber.
  3. Uncouple the discharge pipe from the surface coupling and lift it out of the pump chamber.
  4. Screw the discharge pipe to the pump with the enclosed installation material.
  5. Attach the connection cable to the horizontal part of the discharge pipe using the cable tie supplied. Run the cable from the pump to the cable tie with slight tension and with no slack.
  6. Attach the hoisting chain to the discharge pipe at the slinging point.
  7. Attach the hoisting chain to the lifting accessory.
  8. Lower the pump and discharge pipe into the chamber.
    CAUTION! If the pump and discharge pipe are drained, do not bump into and get stuck on the chamber fittings. Depending on the pump type, turn the pump 90° when draining.
  9. Couple the discharge pipe into the surface coupling.
  10. Disconnect the hoisting chain from the lifting accessory and hang it on the chain hook in the pump chamber.
  1. Pump installed. Next step: Install the level control device.
Install the pump
Install the pump