Transport

  • Wear protective equipment! Observe the work regulations.
    • Protective gloves: 4X42C (uvex C500 wet)
    • Safety shoes: Protection class S1 (uvex 1 sport S1)
  • Transport the pump chamber on a pallet.
  • Set down the pump chamber vertically.
  • To avoid damage to the pipework and pipe adaptors, keep the pump chamber vertical during transport.
  • Secure the pump chamber against slipping and falling over.
  • When lashing, make sure that the plastic parts do not deform.
  • Close any openings, ensuring they are sealed watertight.
  • Remove loose accessories from the pump chamber and pack them separately.
Slinging points
Slinging points

NOTICE! Thoroughly clean used pump chambers before shipping and disinfect them!