Operator responsibilities
- Provide installation and operating instructions at the switchgear or at a place specially reserved for it.
- Make the installation and operating instructions available in a language the personnel can understand.
- Make sure that the installation and operating instructions are read and understood by all personnel.
- The installation site of the switchgear is overflow-proof.
- The switchgear must be properly fused and earthed.
- The signal transmitter must be installed and set in accordance with the system documentation.
- Observe the minimum water submersion of the connected pumps.
- Safety devices (incl. emergency off) of the entire system are switched on and checked for trouble-free operation.
- The switchgear is suitable for use under the specified operating conditions.