Installation of switchgear
Attach the switchgear to the wall with the four screws and wall plugs.
- Max. screw diameter:
- Control EC-L 1x.../EC-L 2x...: 4 mm
- Control EC-L 3x...: 6 mm
- Max. screw head diameter:
- Control EC-L 1x.../EC-L 2x...: 7 mm
- Control EC-L 3x...: 11 mm
- Switchgear is disconnected from the mains and voltage-free.
- Align the drill template at the installation location and attach.
- Drill and clean the mounting holes in accordance with the specifications of the fixation material.
- Remove the drill template.
- Loosen the screws on the cover and remove the cover to the side.
- Attach the lower part to the wall with the fixation material.
Check the lower part for deformations! Realign deformed housing covers (e.g. by placing alignment plates below them) to ensure the housing cover closes precisely. - Close the cover and fasten it with the screws.
- The switchgear is installed. Now connect the mains, pumps and signal transmitter.