Shutdown
- Close the shut-off valve in the inlet pipe.
- Switch the switchgear to standby mode.
- Drain the pump chamber.
Activate the pump in manual mode and drain the pump chamber. - Close the shut-off valve in the discharge pipe.
- Pump out the leftover fluid through emergency draining.
- Switch off the pumping station:
- Pumping station without a switchgear: Pull the plug out of the socket.
- Pumping station with a switchgear: Switch off the switchgear at the main switch.
- The pumping station is decommissioned.
If the pump chamber is out of operation for a long time, do a “test run” at regular intervals (quarterly).