Laying the connection cables
- Lay all connection cables for the pump and level control device through the ventilation/cable bushing connection. NOTICE! Make sure that the connection cables are sufficiently long for the pump and the level control device to be removed from the pump chamber when necessary.
- Hang all connection cables (NOT the pressure hose for the dynamic pressure bell) over the chain hooks in the pump chamber. If necessary, to prevent the connection cables from getting into the fluid or into the pump suction opening, connect them using the cable ties supplied. Do not squash or kink the cables. Keep them away from sharp edges.
- Clean the pump chamber and supply lines of coarse contaminants.