Excavating the pit
- Preparation work for installation is done.
- Obey local regulations to excavate the pit, keep these points in mind:
- Pump chamber height
- Inlet pipe depth
- Height of connection port DN/OD 150 or DN/OD 200
- Location of the connections
- Underlay thickness
- Levelling layer thickness
- Max. height adjustment of the cover
- Pump chamber extension height at max. 500 mm
- Make sure that the pit diameter on the ground is 2 m larger than the pump chamber diameter.
- Obey the applicable regulations for earthworks in underground engineering and road building (slope angle, installation). If necessary because of the ground water level, prevent damage of the pit using a ground water drawdown.
- Install the load-bearing underlay correctly and seal it.
- Add a levelling layer and level off.
- Prepare the piping provided by the customer.