Preparing pipe connections
Install and lay all pipes so that they are stress-free.
- Cut out the selected connection ports for the inlet and venting pipe and remove burrs.
- Lay the pipes with a downward slope to the pump chamber. Connect the pipes to the open connection ports using a KG sleeve and lubricants.
- Connect the on-site discharge pipe to the discharge port using clamp bolting. Make sure that the routing is frost-proof.
- Obey the applicable regulations to do a leak test.
- Pipe connections are prepared. Next step: Installing the pump chamber extension