Work steps
Install the pump chamber in these steps:
- Prepare the installation
- Excavate the pit
- Install the pump chamber
- Prepare pipe connections
- Install the pump chamber extension:
- With pump chamber cover class A15 and B125.
- With pump chamber cover class D400.
- Fill the pit
- Install the pump
- Install the level control device
- Lay the pipes and connection cables
- Install the pump chamber cover
- Install the flush connection and the vacuum relief valve