Lifting unit failure

If the lifting unit fully fails, pump out the sewage using a diaphragm hand pump.

  1. Close the shut-off valve in the inlet.
  2. Close the shut-off valve in the discharge pipe.
  3. Pump sewage into the discharge pipe using the diaphragm hand pump.