Connecting the ventilation pipe
The connection of a ventilation pipe is mandatory. Furthermore, ventilation is necessary to make sure that the lifting unit functions correctly. Follow these points to connect the ventilation pipe:
- For floor-mounted or concealed-wall installation in buildings, route the ventilation pipe over the roof of the building.
- For concealed-floor installation (underground installation) outside buildings, route the ventilation pipe over the surface.
- Make sure that all connections are fully tight.
1 | Ventilation connection |
2 | Discharge port |
- Lifting unit is installed.
- Ventilation pipe is laid.
- Put the HT double socket on the open ventilation connection.
- Put the ventilation pipe into the HT double socket.
- Ventilation pipe is installed. Next step: Connecting a diaphragm hand pump to the drain connection (when it is necessary for emergency drainage).