Shutdown
- Close the shut-off valve in the inlet pipe.
- Switch the switchgear to standby mode.
- Drain the collection tank.
Activate the lifting unit in manual mode and drain the collection tank. - Close the shut-off valve in the discharge pipe.
- Switch off the lifting unit.
Pull the plug out of the socket.
- The lifting unit is now decommissioned.
If the lifting unit is decommissioned for an extended time, do a functional check at regular intervals (quarterly).