Before switch on the pump
Examine these points before starting the pump:
- Electrical connection complies with local regulations?
- Connection cable safely laid (preventing from tripping points and damage)?
- Level control operates correctly?
- Level control switching points are correctly set?
- Operating conditions kept (fluid temperature, suction depth)?
- Hydraulics filled and vented?
- Suction filter is installed?
- Air vent valve is installed in the discharge pipe?
- Shut-off valve in the discharge pipe is open?
- For Drain LPC 40 only: foot valve is installed on the suction pipe?