3 | Terminal strip: Earth (PE) |
5 | Contactor |
Insert the connection cable laid by the customer through the threaded cable glands and secure. Connect the wires to the contactor as per the connection diagram.
NOTICE! After all pumps have been connected, set the motor current monitoring!