Install the pump chamber
1 | Mounting bracket (2 pieces) |
2 | Fixation for mounting bracket:
|
3 | Floor fixation:
|
Install pump chamber so as to protect against buoyancy and twisting. Anchor the lifting unit to the floor for this.
- Preparatory tasks have been completed.
- Installation location prepared according to consulting documents.
- Enclosed fixation material: Observe the information on the building ground! If necessary, provide suitable fixation material for the floor fixation on-site.
- SW8 and SW13 wrench
- Place the pump chamber at the installation site and align it with the on-site pipework.
- Mount the mounting brackets on the chamber ribs (Item 2).
- Mark the boreholes.
- Place the pump chamber to one side.
- Drill and clean the boreholes.
- Insert wall plugs (Item 3)
- Align the pump chamber with the boreholes.
- Attach the pump chamber to the floor (Item 3).
- Pump chamber installed so as to protect against buoyancy and twisting.
- Next step: Connect the pressure pipe.