Preparatory tasks
- Unpack the pump chamber.
- Remove the securing mechanisms.
- Check the scope of delivery.
- Prepare the installation location:
- Horizontal and flat installation surface!
- Space for an additional clearance area of at least 60 cm (2 ft) provided!
- Fixation with dowels possible.
- Clean, free of coarse solids
- Dry
- Frost-free
- Well lit
- Keep accessories available for later use:
- Chamber cover
- Y-piece
- The pump chambers WS 40 ... D and WS 50 ... D have separate pipework for each pump. They therefore also have two discharge ports.
NOTICE! Y-piece to be provided on-site! - Switchgear
- Level control