Work steps
The pump chamber is installed in the following steps:
- Preparatory tasks.
- Install the pump chamber.
- Connect the pressure pipe.
- Connect the inlet.
- Connect the vent.
- Connect the emergency drain.
- Install the pump.
- Install the level control device.
- Lay the connection cable.
- Fit the chamber cover.