Clean and disinfect

  1. Pumping station decommissioned.
  1. Remove the chamber cover.
  2. Activate the unit:
  3. Unit without switchgear: Insert plug into socket.
  4. Unit with switchgear: Activate switchgear at the main switch.
  5. Open the gate valve in the pressure pipe.
  6. Spray the pump chamber from the inside via the chamber opening using clean water from top to bottom.
  7. Disinfect the pumping station.
  8. Drain the pump chamber.
  9. Unit with switchgear: Activate the pump in manual mode and drain the pump chamber.
  10. Repeat steps 4 to 6 until the pump chamber, pump and level control device are cleaned.
  11. Close the gate valve in the pressure pipe.
  12. Pump out the remaining pumped fluid via emergency draining.
  13. Decommission the pumping station.
  14. Allow the pumping station to dry out.
  15. Fit the chamber cover.
  1. Pumping station disinfected. The individual components can now be removed.