DrainLift WS 50E/WS 50D Basic

1

Pump chamber discharge outlet

2

Discharge line, on-site

3

Clamp bolting, fixed part

4

Clamp bolting, clamp ring

5

Clamp bolting with female thread 2½"

WS 50 ... Basic: Connecting the pressure pipe
WS 50 ... Basic: Connecting the pressure pipe
  1. Pump chamber installed properly.
  2. Pressure pipe installed correctly to the discharge port according to consulting documents.
  3. Installation material DrainLift WS 50E: 1x clamp bolting or threaded fitting, to be provided on-site.
  4. Installation material DrainLift WS 50D: 2x clamp bolting or threaded fittings and Y-piece, to be provided on-site
  1. Loosen the clamp ring, do not unscrew.
  2. Screw the clamp bolting onto the discharge outlet.
  3. Insert the discharge line into the clamp bolting as far as it will go.
  4. Tighten the union nut and clamp ring firmly.
  5. Tighten the clamp ring firmly.
  1. Pressure pipe connected.
  2. Next step: Connect the inlet.