Preparatory tasks
- Unpack the pump chamber.
- Remove the securing mechanisms.
- Check the scope of delivery.
- Check all components are in proper working condition.
- CAUTION! Do not install defective components! Defective components can lead to system failures!
- Select installation site:
- Outside buildings.
- Pay attention to local frost depths.
- Not in the immediate vicinity of living and sleeping areas.
- Do not install in peaty soil. CAUTION! Peaty soil destroys the tank!
- Sufficient space available: Pit depth and diameter.
- Ground water level
- The pump chamber is anti-buoyant up to a max. ground water level of 500 mm (above the bottom edge of the chamber base).
- Keep accessories available for later use:
- Chamber cover
- Y-piece
- The pump chambers WS 40 ... D and WS 50 ... D have separate pipework for each pump. They therefore also have two discharge ports.
NOTICE! Y-piece to be provided on-site! - Pump chamber extension (for height adjustment)
- Switchgear
- Level control