Replacing the mounting bracket for ground installation

1

Cable brackets for strain relief

2

Mounting bracket

3

Height grid

4

4x fixation material: Hexagon head screw, washer, hexagon nut

  1. Mixer set down on a firm surface.
  2. Have work carried out by two persons!
  3. Tools are ready for use.
  1. Open the cable brackets and take out the connection cable.
  2. Undo and remove hexagon nuts.
  3. Remove washers from the hexagon head screws.
  4. Second person: Remove mixer from the mounting bracket and hold the mixer.
  5. Remove hexagon head screws.
  6. Insert hexagon head screws in the new mounting bracket.
    NOTICE! Observe the height grid! The propeller must not come into contact with the floor!
  7. Second person: Place the mixer on the hexagon head screws.
  8. Place washers on the hexagon head screws.
  9. Attach and firmly tighten hexagon nuts. Max. tightening torque: see appendix.
  10. Lay connection cable in the cable bracket and close the cable bracket. CAUTION! Do not tighten the cable bracket yet!
  11. Align the connection cable: The connection cable should be slightly bent, it should not be taut.
  12. Close the cable brackets tightly.
  1. Mounting bracket is changed.
Mounting bracket for ground installation
Mounting bracket for ground installation