Wall fixation
In the case of wall fixation, the mixer is mounted directly on the basin wall. Lay the connection cable against the basin wall and lead it upwards.
- Operating space/installation location is prepared for the installation. Defined clearances to fixtures and basin walls are kept in accordance with the consulting documents.
- Mixer is not connected to the mains.
- For installation at heights over 1 m, use scaffolding with a safety harness.
- Have 2 persons position the mixer against the basin wall and mark the fixation holes.
- Set the mixer down outside of the working area.
- Drill fixation holes and insert anchor bolts.
- Once the anchor bolts have hardened in place, have 2 persons place the mixer on the anchor bolts and fix in place with fixation material.
- Fix the mixer firmly against the basin wall.
- Lay the connection cable against the basin wall so that it is slightly taut.
- Apply corrosion protection (e.g. Sikaflex): Fill the slotted holes on the motor flange up to the washer.
- Mixer is installed. Make the electrical connection.