Before activating

Check the following prior to activation:

  • Has the electrical connection been carried out in accordance with regulations?
  • Has the connection cable been routed safely?
  • Can the float switch move freely?
  • Temperature of the pumped fluid observed?
  • Immersion depth observed?
  • Are the pressure pipe and pump sump free of deposits?
  • All gate valves in the pressure pipe open?